1. Here is the finished frame on the site where
it was cut . Next step, the logs are marked and
loaded on the truck. |
2. Custom Handcrafted Logs have brought to the place of assemblage.
The base to it time should be already ready |
|
3. As though so to unload, that anything
not to break!?
|
4. Laying of the wreath log, so
called "pock". After working pock
assembly log construction for this day
suspended, it is a tradition. |
|
5. Logs are placed on each other
according to marks |
6. Between logs we place sealer (moss)
|
|
7. Overlappings are cut on a constraction place,
of the buiding by the level |
8. Rafter system.
|
|
9.Roof purlin. Depending on the future
material of a roof covering, purlin becomes continuous or with a gleam.
|
10. The roof is covered with roofing material. At this stage, the use of other roofing materials is not recommended. Roofing considered temporary. |
|
11. We cut a hole in the wall.
Cut out three - four crowns for improving ventilation at the time of settling and for possibility to get inside |
12. Well? The input is ready! It is possible
to get in.
|